Portfolio: Leisure & Recreation: Arc Cinema

Portfolio item Project image one
Portfolio item Project image two
Portfolio item Project image three
Portfolio item Project image four
Portfolio item Project image five
Portfolio item Project image six
Client:
Melcorpo Properties
Project Architect:
Lafferty Design
Structural Engineer :
Lohan & Donnelly
Services Engineer :
Axis Engineering
  • 2015 Tourism & Hospitality of the Project of the Year (The Irish Construction Industry Awards)
  • 2014 Fit-out Leisure Large Fit Out Project (Fit-Out Awards)

Part demolition and extension to level 3 of an existing shopping centre in order to accommodate a new 6 screen theatre and associated accommodation. The new extension involved the remodelling of the existing level 3, replacement of the existing stairwell between levels 2 and 3, re-configuration of existing plant which was housed on the roof along with substantial intrusion works into the existing retail units which remained in full operation during the works. Manley Construction was also involved in the fast-track fit-out of the Cinema.

Manley Construction’s ability to integrate construction solutions with the overall Design Team utilising 3D BIM technology assured the timely delivery of the project.